The new facility covers an area of 7,200 m² dedicated to production, along with 12,000 m² of roads and green spaces. The building, constructed with prefabricated concrete, stands out for its efficient thermal insulation system and zenithal skylights, which reduce the need for artificial lighting. To further strengthen its environmental commitment, 50% of the roof has been fitted with solar panels, ensuring a more sustainable energy production.
Among the project's technical challenges was the need to integrate the new structure with the existing building, ensuring a continuous operational flow during the expansion. Additionally, the project includes the installation of 12 electric vehicle charging stations and a 40 m² technical building, equipped with a fire control center and a water reservoir for emergency use.
With over 20 years of experience and an international presence, Pradecon reaffirms its position as a leading player in the renewable energy sector, enhancing its ability to meet the growing market demand.
2025
7.200 m²
Arcos, Vila do Conde
GARCIA GARCIA may use cookies to store your login information, collect statistics to optimize site functionality, and perform marketing actions based on your interests.
Necessary Cookies These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.
Funtional Cookier These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.
Advertisement Cookies They allow you to be in touch with your social network, share content, send and post comments.